Skip to main content
Early access 1.6.0 Calculate the y-intercept of a linear least-squares fit between gauge value and time. This corresponds to the projected value at the Postgres epoch (2000-01-01 00:00:00+00). You can use the y-intercept with the slope to plot a best-fit line.

Arguments

NameTypeDefaultRequiredDescription
summaryGaugeSummary-A gauge aggregate created using gauge_agg

Returns

DOUBLE PRECISION: The y-intercept of the linear least-squares fit

Samples

Calculate the y-intercept of the linear fit for each 15-minute gauge aggregate.
SELECT
    id,
    bucket,
    intercept(summary)
FROM (
    SELECT
        id,
        time_bucket('15 min'::interval, ts) AS bucket,
        gauge_agg(ts, val) AS summary
    FROM foo
    GROUP BY id, time_bucket('15 min'::interval, ts)
) t